top of page
EcoShrink

EcoShrink

Admin
More actions

Profile

Join date: Jan 2, 2024

Posts (50)

Apr 12, 20263 min
Marine Shrink Wrap – Fully Enclosed Paint Cure Containment (Temperature-Controlled)
EcoShrink installed a fully enclosed marine shrink wrap containment around a vessel to support specialist paint and coating works. While weather protection was essential, the primary requirement was maintaining a more stable internal environment so temperatures could remain high enough for the coating system being applied. The result was a sealed enclosure designed around exposure, access and practical shipyard constraints. Project Summary at a Glance Category: Marine Wrap Use case: Vessel...

14
0
Apr 12, 20262 min
Portsmouth – Boat Encapsulation on Hardstanding (Marine Containment-Style Wrap)
EcoShrink delivered a containment-style marine encapsulation around a vessel on hardstanding in Portsmouth, creating a sealed external enclosure for weather protection during storage and maintenance activities. With the boat positioned on land and exposed to changing conditions, the brief focused on a tight, continuous outer skin to reduce weather ingress and support a cleaner, more controlled working environment. Project Summary at a Glance Location: Portsmouth (hardstanding / boatyard...

5
0
Apr 2, 20263 min
The Dorchester, Park Lane – Guest-Facing Scaffold Wrap for Phased Works
EcoShrink has delivered multiple phases of scaffold wrapping at The Dorchester on Park Lane over the last 2–3 years, supporting refurbishment activity while maintaining a clean, guest-facing presentation. On a world-renowned luxury hotel, public interface is a primary constraint: the scaffold needs to be controlled, tidy and visually acceptable from arrival routes and key viewpoints, particularly around the main entrance frontage. Project Summary at a Glance Site: The Dorchester Hotel, Park...

8
0
bottom of page