Summary (At a Glance)


🏛️ Client/Site: Adare Manor – John Paul Construction

📍 Location: Limerick, Republic of Ireland

🗓️ Programme: Live conservation & restoration works

🏙️ Exposure: Wind/rain at height • Complex roofs & elevations

🔥 FR grade: Flame-retardant (certified)



Why scaffold encapsulation was chosen


EcoShrink delivered a scaffold encapsulation and temporary roof wrap solution at Adare Manor to protect sensitive masonry and finishes during conservation works. The brief called for a sealed, tidy enclosure over a full perimeter scaffold—including several temporary roofs—to keep trades productive across changeable Limerick weather while maintaining heritage presentation and safe routes for inspections.



Risks & Objectives


  • Control rain, wind and air-borne debris across multiple roof levels

  • Protect heritage stonework, carvings and delicate features (no-fix zones)

  • Maintain stable, dry conditions for conservation methods and materials

  • Keep inspections practical with clear viewing panels and labelled doors

  • Present a clean elevation at a high-profile heritage site



Method


Scope & Prep

  • Heritage review with John Paul Construction: no-fix zones, protection to ornate features

  • RAMS issued; deliveries/quiet hours agreed; exclusion & pedestrian lines set

  • Inspection points mapped; wayfinding for site and conservation teams


Wrap & Weld

  • Installed EcoShrink FR, UV-stable film to scaffold and temporary roof structures

  • Seams heat-welded into a continuous, drum-tight skin; reinforced terminations

  • Anti-chafe at parapets/cappings; labelled zip/roll-up doors for access

  • Clear panels positioned for façade checks and approvals


Fire Safety

  • Hot-work permits for welding; extinguishers at stair/hoist/door locations

  • FR grade confirmed with certificates; no storage near egress; signage installed


Monitoring & Compliance

  • UV/service life matched to programme; daily snag checks and reseals

  • Photo QA during install; FR certificates + care/reseal guidance at handover



Results


The full-perimeter encapsulation and temporary roofs created stable, dry work zones across complex elevations. Teams worked with fewer weather stoppages; heritage presentation stayed neat and secure; and programme certainty improved.


Outcomes

✅ Reduced weather-related delays across roof and façade areas

✅ Cleaner edges and safer, defined access routes

✅ Heritage fabric protected; inspections remained simple and frequent