🏛️ Client/Site: Victoria Halls

📍 Location: Wembley

🗓️ Programme: Live-site façade cladding replacement / renovation

🏙️ Exposure: Wind & rain at height • Close Proximity to school & train station

📏 Area wrapped: 13,000m²

🔥 FR grade: Flame-retardant (certified)



Project Overview – Scaffold Weather Protection Highlights


EcoShrink delivered scaffold weather protection for the Victoria Halls renovation. The brief called for a sealed, tidy enclosure that reduced wind and rain ingress, controlled overspray, and preserved presentation on a live, public-facing site. We specified FR, UV-stable shrink wrap heat-welded into a continuous skin with practical access points for inspections and deliveries.



Risks & Objectives


  • Limit weather delays (wind and rain ingress at height)

  • Control debris fallout near neighbouring properties, school & footpaths

  • Maintain tidy presentation and privacy during works

  • Technical descending interconnecting roofs, complex installation




Method


Scope & Prep

  • Confirmed elevations, access points; issued RAMS and encapsulation plan

  • Planned elevations & weather to ensure smooth, progressive wrapping


Wrap & Weld

  • Installed EcoShrink 300mu, FR, UV-stable film

  • Heat-welded seams to form a continuous, sealed enclosure.

  • Finished with tidy welds and shrinking for a clean street elevation.


Fire Safety

  • FR grade verified with certificates; hot-works permits in place for welding.

  • Extinguishers positioned at stairs/hoists/door locations.


Monitoring & Compliance

  • Service life noted for wraps >6 months; periodic visual checks agreed.

  • Care & reseal guidance supplied, with a small reseal kit for minor repairs.



Results


The enclosure cut wind and rain ingress, improving working consistency at height and reducing call-outs. Public-facing elevations remained tidy, and wayfinding around the scaffold was clearer - supporting programme certainty.


Outcomes:

✅ Fewer weather-related stoppages

✅ Cleaner edges and improved presentation

✅ Durability kept programme on track far longer than cheaper scaffold sheeting