Wates Modular Homes – Shrink Wrap Protection for Delivery to Cardiff
- EcoShrink

- Mar 27
- 2 min read
Updated: Jun 17

EcoShrink installed shrink wrap protection around multiple modular homes built for Wates, preparing the units for delivery to Cardiff. The wrap package created a clean, weather-resistant outer envelope designed to protect the units during storage, handling and transport, helping preserve the external finish and reduce exposure during the delivery programme.
Project Summary at a Glance
Client/project: Modular homes built for Wates
Destination: Cardiff
Category: Modular Covers
Scope: Shrink wrap protection for multiple modular homes
Primary objective: Protect the units during storage, handling and transport
Result: Clean, transport-ready modular homes with a weather-resistant outer wrap
The Brief 🎯
The brief was to wrap multiple modular homes so they could be handled, stored and transported with better protection from weather and general exposure. With the units moving through a logistics chain before arrival in Cardiff, the wrap needed to present cleanly and remain practical for transport operations.
Key Risks and Objectives
Protect modular homes from wind, rain and general transport exposure
Maintain a tidy, professional external finish before delivery
Support handling and transport without leaving exposed faces vulnerable
Create a consistent protective standard across multiple units
Our Method (How EcoShrink Delivered It)
Scope planning around movement and delivery
Confirmed the number of homes, key dimensions and transport requirements.
Planned wrap lines and seam positions to suit handling and delivery logistics.
Shrink wrap installation for transport protection
Installed shrink wrap to create a weather-resistant external skin around each modular unit.
Focused on clean seams, neat corners and a consistent finish across the full batch.
Final checks before loading and movement
Checked continuity, edge detailing and overall finish quality before transport.
Confirmed the units presented as clean, protected and ready for onward delivery.
Results and Outcomes
The completed wrap package helped protect the modular homes through storage and transport, supporting cleaner delivery-ready presentation and reduced exposure before arrival in Cardiff.
Outcomes (claims-safe, observable):
Multiple modular homes protected for handling and transport
Cleaner, more consistent external presentation across the delivered units
Reduced exposure to weather during pre-delivery storage and movement
Practical wrap solution aligned to modular logistics requirements
Sustainability and Materials (Claims-safe)
Transport protection for modular units is typically driven by programme, logistics and the need to preserve finished elements before installation. End-of-life handling depends on the condition of the material after delivery and the waste routes available on site. Where wrap remains clean and segregated, practical recycling options may be improved through local facilities and contractor arrangements.
Next Steps
If you need modular units protected before transport or delivery, EcoShrink can scope the batch and propose a shrink wrap package designed around storage, movement and handover requirements.
FAQ
Why wrap modular homes before they leave the factory?
Wrapping each module before transport seals it against wind-driven rain, road spray and dirt on the journey to Cardiff, so homes arrive clean and ready rather than needing remedial work before installation.
Can a full batch be wrapped to the same standard?
Yes. Wrapping is planned across the whole delivery batch so every module is protected and presents consistently through a phased modular programme.
Does the wrap allow for craneage and lifting on arrival?
Yes. It is detailed around lifting points and access zones so modules can be lifted and positioned on site without stripping the whole cover first.