top of page
CASE STUDIES
Home - Case Studies


Industrial Painting Containment for Costain’s Rail Underbridge overthe M5
EcoShrink delivered industrial painting containment for Costain on a rail underbridge spanning the M5 motorway near Churchdown, Gloucestershire. A heavy-duty shrink wrap enclosure was installed around the bridge soffit so blasting and industrial painting could take place above a live motorway and under a live railway without exposing road users or the surrounding area to debris, dust or overspray. EcoShrink Industrial Painting Containment and Shrink Wrap Enclosures Project ov

EcoShrink
Jan 14, 2022


NCC Bristol: Industrial Shrink Wrap Containment for Full Dust & Debris Protection
EcoShrink delivered industrial shrink wrap containment at NCC Bristol to protect high-value machinery during internal renovation works. A fully enclosed shrink wrap system was installed around scaffold structures to create a sealed work zone, keeping demolition dust and debris away from sensitive equipment while the factory remained operational. Ecoshrink Industrial Shrink Wrap Containment at NCC Bristol, providing Demolition Dust Containment Project Overview NCC Bristol ho

EcoShrink
Oct 1, 2019


Robust Industrial Shrink Wrap Containment for Wessex Water &Bristol Water
EcoShrink designed and installed industrial shrink wrap containment systems for Wessex Water and Bristol Water during essential repairs and restoration works at multiple water treatment plants across the UK. Sealed shrink wrap enclosures were built around critical equipment so blasting and maintenance could proceed without risking contamination of the water supply or interrupting service to local communities . Ecoshrink shrink wrap containment solutions at Wessex Water, provi

EcoShrink
Jan 9, 2018
bottom of page
