top of page
CASE STUDIES
Home - Case Studies


Industrial Painting Containment for Costain’s Rail Underbridge overthe M5
EcoShrink delivered industrial painting containment for Costain on a rail underbridge spanning the M5 motorway near Churchdown, Gloucestershire. A heavy-duty shrink wrap enclosure was installed around the bridge soffit so blasting and industrial painting could take place above a live motorway and under a live railway without exposing road users or the surrounding area to debris, dust or overspray. EcoShrink Industrial Painting Containment and Shrink Wrap Enclosures Project ov

EcoShrink
Jan 14, 2022


Cardiff Bay Barrage & Bascule Bridges: Shrink Wrap Containment forBlasting
EcoShrink delivered shrink wrap containment for blasting on the Cardiff Bay Barrage Bascule Bridges in Cardiff Bay. A sealed shrink wrap enclosure was installed around each bridge so blasting and repainting could take place in a busy waterfront setting, above water and public walkways, without dust, debris or overspray affecting visitors or the marina. Project overview Cardiff Bay is a busy waterfront destination, with popular boardwalks, viewing platforms and marina access r

EcoShrink
Mar 8, 2019
bottom of page
