top of page

Petro, Moorgate – Atrium Screen to Shield Scaffolding Above the Main Entrance

  • Writer: stephen aluko
    stephen aluko
  • Mar 30
  • 2 min read


EcoShrink installed a high-level atrium screen at Petro in Moorgate, central London, to fully shield scaffolding positioned above the building’s main entrance. With the screen directly in a publicfacing sightline, presentation was critical. The finished screen created a clean, uniform visual barrier, reducing the impact of scaffold works on the entrance experience while the project progressed overhead.


Project Summary at a Glance


  • Location: Moorgate, Central London

  • Site interface: Main entrance / atrium zone

  • Scope: High-level atrium screen to shield scaffolding

  • Primary objective: Maintain a clean, professional public-facing presentation

  • Result: Scaffolding screened from view at a key entrance interface




The Brief 🎯


The brief was to provide an atrium screen positioned high above the main entrance point, shielding scaffolding and works from view. The screen needed to read cleanly from the entrance level and surrounding internal sightlines, helping maintain a professional appearance in a hightraffic, commercial environment.



Key Risks and Objectives


  • Fully shield scaffolding from view at the entrance interface

  • Maintain a clean, consistent screen finish suitable for a central London setting

  • Deliver a tidy solution in a constrained atrium environment with complex surrounding structure

  • Support safe installation and a stable finished appearance at height





Our Method (How EcoShrink Delivered It)


Interface review and screen positioning


  • Confirmed the key viewing angles from the entrance zone and atrium.

  • Planned screen placement to ensure the scaffold works were fully masked in the main sightlines.


High-level screen installation


  • Installed a continuous screen to form a uniform visual barrier over the scaffold zone.

  • Focused on clean lines and consistent presentation across joins and edges.


Finish checks from real viewpoints


  • Checked the finished screen from the entrance level and atrium sightlines.

  • Confirmed the screen achieved full scaffold shielding and a tidy, professional appearance.



Results and Outcomes ✅


The installed atrium screen fully shielded the scaffolding above the main entrance, improving the public-facing presentation while works continued overhead.


Outcomes (claims-safe, observable):


  • Scaffolding fully screened from view at the main entrance interface

  • Cleaner atrium presentation in a high-traffic commercial environment

  • Uniform screen finish with tidy lines and joins



Sustainability and Materials (Claims-safe)


Screening requirements are driven by programme and interface needs. End-of-life handling depends on the condition of the materials after use and the waste routes available through the client’s contractor. Where materials remain clean and suitable, reuse or recycling options may be improved.


Next Steps


If you need atrium screening or entrance-interface scaffold shielding in a live commercial building, EcoShrink can scope the viewing angles and propose a method-led screening solution designed to maintain presentation while works progress.


FAQ



What is an atrium screen used for during refurbishment works?


An atrium screen is used to shield scaffolding and works from view and help maintain a cleaner presentation in public-facing internal spaces.


Can you design screening around sightlines from entrances and reception areas?


Yes. We plan screen positioning around the real viewing angles so the scaffolding is properly masked where it matters most.


Is atrium screening suitable for constrained central London buildings?


Yes. Screening can be planned around structural constraints and access limitations, with the finished appearance checked from key viewpoints.




bottom of page